
Xianghomen WWTP
Client
Beijing Drainage Group Co., Ltd
Location
Beijing, China
Capacity
WWTP: 600,000 m3/d, Sludge digester volume: 5 x 12,000 m3
Turnkey plant with advanced technology for anaerobic sludge treatment and biogas utilisation for one of China\’s largest municipal wastewater treatment plants. The plant produces 67,000 kWh/d.
Project Highlights
- Sludge storage tanks for primary and excess sludge
- Thickening
- Anaerobic sludge digestion
- Dewatering
- P-removal system for sludge dewatering
- Biogas treatment and storage system
- Air blower station with biogas utilization
- Boiler room with biogas utilization